Most residential Meralco customers pay only for active power (kWh). But commercial and industrial accounts also pay for reactive power (kVAR) through power factor charges. Understanding how solar inverters interact with power factor is important for commercial solar customers.
Active power (kW): Real work — powers lights, motors, computers. You pay per kWh.
Reactive power (kVAR): Magnetic field energy in motors and transformers — no useful work but flows through wires. Poor power factor means paying for losses.
Power factor (PF): kW ÷ kVA. Perfect PF = 1.0. Typical commercial building: 0.80-0.90. Meralco penalizes PF below 0.85 for commercial accounts.
| Inverter Mode | Power Factor | Effect on Bill |
|---|---|---|
| Standard grid-tie (unity PF) | 1.0 (export at unity) | Reduces active power from grid; no reactive improvement |
| Reactive power compensation mode | Adjustable 0.8 leading/lagging | Can improve building power factor — reduces kVAR charges |
| Smart inverter (IEEE 1547-2018) | Dynamic — responds to grid needs | Premium feature; available in Huawei, SMA, Fronius |
If your commercial building has a low power factor (below 0.85), your Meralco bill includes a kVAR surcharge. Two solutions work together:
On your Meralco commercial bill, look for:
A 100kW commercial solar system with reactive power compensation mode can eliminate ₱15,000-40,000/month in kVAR charges in addition to energy savings.
Find commercial solar specialists at solarenergyph.shop.
Engr. Jason Morales — Founder, SolarEnergyPH