Net metering is the legal right of Philippine solar owners to sell excess electricity back to their distribution utility (Meralco, VECO, etc.) at the prevailing generation rate. It is governed by Republic Act 9513 (Renewable Energy Act) and DOE Circular DC2013-05-0009. Here is the exact process.

Who Qualifies

Step-by-Step Application Process

StepActionTimeline
1Install solar system — get as-built drawings and permits from contractorBefore application
2Download Meralco Net Metering Application Form from meralco.com.phDay 1
3Compile documents: single-line diagram, building permit, electrical permit, PRC-licensed EE signatureDay 1-5
4Submit application at Meralco Business Center (bring originals + photocopies)Day 5-7
5Meralco inspection of installationWithin 30 days
6Bidirectional meter installation by MeralcoWithin 60 days
7Sign Net Metering Agreement — valid for 10 years, renewableAfter meter install

What You Earn

Meralco credits excess generation at the blended generation charge — approximately ₱5.00-6.50/kWh (varies quarterly). This credit offsets your monthly bill. Unused credits roll over monthly but are forfeited annually (bank resets every March billing cycle).

Important Documents Required

Connect with DOE-accredited installers who handle the full net metering application for you at solarenergyph.shop.

Engr. Jason Morales — Founder, SolarEnergyPH