Earthing (grounding) is the most under-inspected aspect of solar PV installations in the Philippines. Visible components like panels and inverters are obvious — earthing conductors hidden behind cable trays are not. Yet improper earthing is the root cause of electric shock incidents and equipment failures in solar systems.
| Component | Requirement | Minimum Size |
|---|---|---|
| Panel frames (mounting structure) | All metal parts bonded to equipment ground | 6mm² bare copper or green/yellow |
| Inverter chassis | Equipment grounding conductor to main earth | Sized per output circuit |
| DC negative (ungrounded systems) | Ground fault detection required (built into inverter) | N/A — inverter function |
| Earth electrode | Ground rod minimum 2.4m driven at building perimeter | 16mm diameter copper-clad steel rod |
| Main earthing conductor | Connects electrode to MDB and inverter earth bus | Minimum 16mm² copper |
Ask your installer to perform an earth continuity test with a multimeter or earth tester. Resistance from any panel frame to the earth electrode should be below 1 ohm. Resistance above 5 ohms indicates a bonding defect requiring correction.
Request an earth continuity test report from installers at solarenergyph.shop.
Engr. Jason Morales — Founder, SolarEnergyPH